首页 体育内容详情
最新博彩网址(www.99cx.vip)_Kelana Jaya LRT line to increase train frequency by August, says transport minister

最新博彩网址(www.99cx.vip)_Kelana Jaya LRT line to increase train frequency by August, says transport minister

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

最新博彩网址www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。最新博彩网址上线上最新博彩网址会员登录线路、最新博彩网址代理网址更新最快。最新博彩网址开放皇冠官方会员注册、皇冠官方代理开户等业务。

,Transport Minister Dr Wee Ka Siong says all repairs on carriages servicing the Kelana Jaya LRT line will be completed in November. – The Malaysian Insight file pic, June 16, 2022.

TRAIN frequency for the Kelana Jaya LRT line is expected to improve by August, Transport Minister Dr Wee Ka Siong said. 

He said it would be improved from eight minutes to at least five minutes after more damaged carriages are repaired.

“We have identified the cause for the damage and now repairs need to be done. So this August would be the interim progress, the frequency would be at five minutes,  and in November we will be able to complete all repairs,” he told a media conference today. 

Earlier, Wee had accompanied Prime Minister  Ismail Sabri Yaakob for a ride on the Putrajaya Phase 1 Mass Rapid Transit (MRT) line from the Kampung Batu station to Sri Damansara Sentral.

Wee said the Transport Ministry (MOT) had set the August and November target because a lot of preventive maintenance had to be carried out due to safety factors.

MOT apologises to all affected LRT users for the inconvenience, Wee said, adding that the delays were unavoidable in the interest of safety. 

“If we were to keep using (problematic trains) and there are risks… we would not want any untoward incidences,” he said. 

On May 22, Prasarana Malaysia Bhd said it had set up a committee after one of its trains on the Kelana Jaya Line stalled two days earlier due to a brake caliper hydraulic leakage, affecting about 22,100 passengers. – Bernama, June 16, 2022.


转载说明:本文转载自Sunbet。
 当前暂无评论,快来抢沙发吧~

发布评论